NINE
Floors
182
Families
66.4%
Open Space
1.8
Acres

FOUNDATION & STRUCTURE

RCC framed Structure designed to withstand wind and seismic loads.

SUPER STRUCTURE

External Walls : 8” thick Porotherm Bricks.
Internal Walls : 4” thick Porotherm Bricks.

WALL FINISHES

External Wall

Sponge finished sand faced cement plaster and painted with exterior paint or texture.

Internal Wall

Smooth plastered surface treated with putty and painted with emulsion.

DOORS

Main Door

Frame and shutter of Hormann or equivalent.

Internal Door

Frame and shutter of Hormann or equivalent.

WINDOWS

Windows

TOSTEM windows sliding with glass.

French Door

TOSTEM windows sliding with glass.

Grills

Aesthetically designed MS with enamel paint finish.

FLOORING

Kitchen & Balcony

Anti-skid ceramic tiles.

Toilets

Acid-resistant, Anti-skid ceramic tiles.

Corridors

Anti-skid, High resistant ceramic tiles.

Staircase

Natural Stone with moulding as required.

DADOOING

Kitchen

Ceramic tile dado of standard brand up to 2’ height above kitchen platform.

Toilets

Ceramic tile dado of standard brand up to 7’ height.

Utility

Ceramic tile dado of standard brand up to 3’ height.

Lift

Natural stone cladding as per architects design.

KITCHEN

Granite platform with stainless steel sink.
Provision for exhaust fan or chimney.
Provision for RO.

BATHROOMS

Toilets with European WC, wash basin with necessary fittings.
Dining wash basin with necessary fittings.

ELECTRICAL

Concealed copper wiring of standard brand with Modular electrical switches of Havell’s or equivalent.
ELCB & Miniature circuit breakers (MCB) for each distribution board.
Power outlets for air conditioners in all bedrooms.
Power plugs for refrigerator, microwave ovens/mixer & Washing machine.
Three-phase supply for each unit with individual meter.

TELCOM

Telephone points in master bedroom & living room.
Intercom facility to all the units connecting security.

CABLE TV & INTERNET

Provision for cable connection in master bedroom & living room.
One internet provision in each flat.

LIFTS

High-speed automatic passenger lifts with rescue device with v3f for energy efficiency of standard make.

FIRE & SAFETY

Fire safety system will be provided as per norms

WTP & STP

A Softener plant of required capacity will be provided inside the project.
A Sewage treatment plant of adequate capacity will be provided, treated sewage water will be used for the landscaping & flushing purpose.
Rain water harvesting pits will be provided.

GENERATOR

Complete DG set backup excluding AC points will be provided.

Facilities for physically challenged

Access ramp at entrance shall be provided for physically challenged.

SECURITY

Round-the-clock security system.
Surveillance cameras will be provided.
Solar-powered security fence for total compound.

PARKING MANAGEMENT

Entire parking is well designed to suit the number of car parks required.
Parking signages at required places.
Water outlet points for Car wash would be provided in the basements.

CLUBHOUSE & AMENITIES

Well-designed clubhouse of 8500 SFT with facilities like gym, multipurpose hall, indoor games, Saloon.
Swimming pool with changing rooms & showers.
Guest rooms will be provided.

Enquiry Form